Products
Explore Circuitera’s Arduino IDE, Simulator, Dot, Terminal, and Serial tools.
Arduino IDE
From a sketch to real hardware.
Write Arduino sketches online, compile locally with AVR-GCC, and upload to supported boards with Web Serial. Use serial tools and manage projects.
Explore Arduino IDE
Simulator
Connect ideas. Test behavior.
Simulate Arduino circuits online with Circuitera. Wire supported components, run real Uno firmware, and inspect signals beside your code.
Explore Simulator
Dot
Ask with context.
Ask Dot about code, compiler diagnostics, and attached circuit context inside the Circuitera workspace.
Explore Dot
Terminal
A place for general programming.
Write general C++ programs in Circuitera Terminal with real WebAssembly execution, standard input, diagnostics, and Stop controls.
Explore Terminal
Serial Tools
See what your board is saying.
Read Arduino output, send serial input, and plot numeric signals in your browser using Circuitera’s Web Serial tools.
Explore Serial Tools